*Note: For keyword searches, use Keywords for Database Search with quotes (example: “Full-Depth Precast Deck Panel w/o PT”).
Reset Search
Found 126 Results

2023 – CO 61 North of Otis, D-25-EA

State: CO
Year: 2023
Owner: State
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 112
Total Bridge Length (ft.): 118
Impact Category: Tier 3 (within 2 weeks)
Construction Equipment Category: Lateral Slide

Project Planning: State process, benefit/cost method, CM/GC, formalized partnering
Geotechnical Solutions:
Structural Solutions: adjacent box beam, precast abutment cap, precast wingwall, FDcBc {Full-Width concrete-Decked concrete Beam Unit}, precast approach slab, other miscellaneous prefabricated element: precast sleeper slab, CIP reinforced closure joint, socket connection, asphalt overlay w/membrane


2019 – Bridge 7345

State: NM
Year: 2019
Owner: State
Location: Rural
Beam material: Concrete

Spans: > Three-span
Max Span Length (ft.): 92.5
Total Bridge Length (ft.): 325
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Conventional

Project Planning: State Process, Design-Bid-Build, A+B Bidding; Full Lane Closure; Incentive / Disincentive Clause
Geotechnical Solutions: Reused Substructure/Foundation Unit,
Structural Solutions: Full-Depth Precast Deck Panel w/o PT, Precast Approach Slab; UHPC Closure Joint; Thin-Bonded Epoxy Overlay


Completed bridge

2019 – Blackhall Road at Rum Creek Bridge

State: GA
Year: 2019
Owner: County
Location: Urban
Beam material: Concrete

Spans: Three-span
Max Span Length (ft.): 93
Total Bridge Length (ft.): 195
Impact Category: Tier 5 (within 3 months)
Construction Equipment Category: Conventional

Project Planning: FHWA process, state process, benefit/cost method, right-of-way acquisition, design-bid-build, A+B bidding, full lane closure
Geotechnical Solutions:
Structural Solutions: MDcBc (Modular concrete-Decked concrete Beam), steel diaphragm, UHPC closure joint


2017 – Bridge 1-438 on N463 Blackbird Station Road over Blackbird Creek

State: DE
Year: 2017
Owner: State
Location: Rural
Beam material: Concrete

Spans: One-span
Max Span Length (ft.): 50
Total Bridge Length (ft.): 50
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Conventional

Project Planning: Design-Bid-Build,
Geotechnical Solutions:
Structural Solutions: Adjacent box beams, precast abutment caps, precast wingwalls, precast prestressed concrete piles, precast curbs, prefabricated railing, UHPC closure joints, socket connection, UHPC overlay


2017 – Bridge NB-355 at Milepost A-57.66

State: PA
Year: 2017
Owner: Pennsylvania Turnpike Commission
Location: Urban
Beam material: Steel

Spans: One-span
Max Span Length (ft.): 118
Total Bridge Length (ft.): 118
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: Lateral Slide

Project Planning: design-bid-build
Geotechnical Solutions: micropiles,
Structural Solutions: FDcBs {Full-Width concrete-Decked steel Beam Unit},


2017 – Cannelville Road Bridge

State: OH
Year: 2017
Owner: Muskingum County
Location: Rural
Beam material: Steel

Spans: One-span
Max Span Length (ft.): 52.5
Total Bridge Length (ft.): 52.5
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Conventional

Project Planning:
Geotechnical Solutions:
Structural Solutions: Orthotropic deck - SPS (Sandwich Plate System); MDhBs (Modular hybrid-Decked steel Beam - SPS deck on press-brake-formed tub girders),


2017 – Sacramento Wash Crossing at Oatman Highway (Historic Route 66)

State: AZ
Year: 2017
Owner: County
Location: Rural
Beam material: Steel

Spans: One-span
Max Span Length (ft.): 112
Total Bridge Length (ft.): 113.83
Impact Category: Tier 2 (within 3 days)
Construction Equipment Category: Other ABC Method

Project Planning: Programmatic Agreement, Design-Bid-Build, Incentive / Discentive Clause
Geotechnical Solutions:
Structural Solutions: MDcBs (Modular concrete-Decked steel Beams), Precast abutment caps, Precast backwalls, Precast approach slabs, High-strength CIP reinforced closure joints


Strodes Mills Bridge

State: PA
Year: 2016
Owner: State
Location: Rural
Beam material: Steel

Spans: One-span
Max Span Length (ft.): 50
Total Bridge Length (ft.): 54
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Conventional

Project Planning: Public-Private Partnership (P3),
Geotechnical Solutions:
Structural Solutions: MDcBs (Modular concrete-Decked steel Beam) - Folded Steel Plate Girder System (FSPGS), CIP reinforced concrete closure joints, prefabricated railing, polyester polymer concrete overlay


2016 – Franklin Avenue Bridge Rehabilitation

State: MN
Year: 2016
Owner: Hennepin County
Location: Urban
Beam material: Concrete

Spans: > Three-span
Max Span Length (ft.): 400
Total Bridge Length (ft.): 1050
Impact Category: Tier 6 (longer but reduced by months/years)
Construction Equipment Category: Other ABC Method

Project Planning: Benefit/Cost Method, Programmatic Agreements, Early Environmental Clearance & Permitting, Design-Bid-Build, Incentive / Disincentive Clause
Geotechnical Solutions:
Structural Solutions: Full-Depth Precast Deck Panel w/o PT, Precast Column Cap (Precast Spandrel Cap Beams), Precast Abutment Cap, UHPC Closure Joint, Polymer Concrete Overlay, Precast Approach Slab, Prefabricated Railing (Ornamental Rail Panels)


Wrights Corners Bridge

State: PA
Year: 2016
Owner: State
Location: Rural
Beam material: Steel

Spans: One-span
Max Span Length (ft.): 45
Total Bridge Length (ft.): 49
Impact Category: Tier 4 (within 1 month)
Construction Equipment Category: Conventional

Project Planning: Public-Private Partnership (P3),
Geotechnical Solutions:
Structural Solutions: MDcBs (Modular concrete-Decked steel Beam) - Folded Steel Plate Girder System (FSPGS), CIP reinforced concrete closure joints, prefabricated railing, polyester polymer concrete overlay