ABC Research Database

91 research projects found
  • image
    Development of Prefabricated Bridge Railings
    • Category: On-Going Projects
    • Group: Railings
    • Subject: Prefabricated Railing
    • Primary Performing Agency: Iowa State University
    • Primary Sponsor: Accelerated Bridge Construction University Transportation Center
    • Start Date: 2014-05-01
    • Completion Date:
    • Keywords: Prefabricated Railing
    • Specific ABC aspect: Prefabricated Railing
  • image
    Synthesis on the Use of Accelerated Bridge Construction Approaches for Bridge Rehabilitation
    • Category: Completed Projects
    • Group: Joints
    • Subject: Bridge Rehabilitation
    • Primary Performing Agency: Iowa State University
    • Primary Sponsor: Accelerated Bridge Construction University Transportation Center
    • Start Date: 2014-05-01
    • Completion Date: 2015-10-01
    • Keywords: accelerated bridge construction; bridge construction; bridge repair alternatives; rapid bridge rehabilitation; traffic mobility
    • Specific ABC aspect: rapid bridge rehabilitation
  • Precast Prestressed Concrete Pavement to Abate Settlement Problems Under Bridge Approach Slabs
    • Category: On-Going Projects
    • Group: Super Structure
    • Subject: Approach Slabs
    • Primary Performing Agency: Texas A&M University, College Station
    • Primary Sponsor: Oklahoma Department of Transportation
    • Start Date: 2015-10-01
    • Completion Date: 2016-09-30
    • Keywords: Bridges and other structures; Design; Highways; Pavements; I30: Materials
    • Specific ABC aspect: Precast bridge elements and systems
  • Development of a Family of Ultra-High Performance Concrete Pi-Girders

    • Category: Completed Projects
    • Group: UHPC
    • Subject: PI girders
    • Primary Performing Agency: Federal Highway Administration (FHWA)
    • Primary Sponsor: Federal Highway Administration (FHWA)
    • Start Date: 2014-01-01
    • Completion Date: 2014-01-01
    • Keywords: Ultra-high performance concrete, UHPC, finite element analysis, pi-girder, structural optimization
    • Specific ABC aspect:
  • Structural Characterization of a UHPC Waffle Bridge Deck and Its Connections
    • Category: Completed Projects
    • Group: UHPC
    • Subject: Waffle Slabs
    • Primary Performing Agency: Iowa State University
    • Primary Sponsor: Iowa Department of Transportation
    • Start Date: 2009-11-01
    • Completion Date: 2011-01-09
    • Keywords: Civil Construction and Environmental Engineering, BEC, accelerated bridge construction, bridge deck connections, Highways for LIFE, load testing, precast bridge sections, ultra-high-performance concrete, waffle deck, Wapello County Iowa
    • Specific ABC aspect:
  • Design Guide for Precast UHPC Waffle Deck Panel Systems
    • Category: Completed Projects
    • Group: UHPC
    • Subject: Waffle Slabs
    • Primary Performing Agency: Iowa State University
    • Primary Sponsor: United States Department of Transportation
    • Start Date: 2013-06-01
    • Completion Date: 2013-06-01
    • Keywords: accelerated bridge construction, bridge deck connections, bridge design, bridge panel systems, bridge redecking, Highways for LIFE, load testing, precast bridge sections, replacement bridges, ultra-high-performance concrete, waffle decks, Wapello County Iowa
    • Specific ABC aspect:
  • Precast Alternative for Flat Slab Bridges
    • Category: Completed Projects
    • Group: UHPC
    • Subject: NEXT Beams
    • Primary Performing Agency: Clemson University
    • Primary Sponsor: South Carolina Department of Transportation
    • Start Date: 2013-10-26
    • Completion Date: 2013-10-26
    • Keywords: Precast bridge joint, hollow-core bridge, NEXT D bridge, bridge construction, prestressed concrete bridge
    • Specific ABC aspect:
  • Bond Behavior of Reinforcing Steel in Ultra-High Performance Concrete
    • Category: Completed Projects
    • Group: UHPC
    • Subject: Bond
    • Primary Performing Agency: Federal Highway Administration (FHWA)
    • Primary Sponsor: Federal Highway Administration (FHWA)
    • Start Date: 2014-10-01
    • Completion Date: 2014-10-01
    • Keywords: Ultra-high performance concrete, UHPC, fiber-reinforced concrete, reinforcing bar, bond strength, anchorage, development length, splice length
    • Specific ABC aspect:
  • Polyurethane Foam Infill for Fiber-Reinforced Polymer (FRP) Bridge Deck Panels
    • Category: Completed Projects
    • Group: Decks
    • Subject: FRP Decks
    • Primary Performing Agency: Missouri University of Science and Technology
    • Primary Sponsor: Missouri Department of Transportation
    • Start Date: 2014-05-01
    • Completion Date: 2014-05-01
    • Keywords: Bridge Decks, Composites, Corrosion, Durability, Fiber-Reinforced Polymers, Polyurethane Foam, Vacuum-Assisted Resin Transfer Molding.
    • Specific ABC aspect:
  • Full Closure Strategic Analysis
    • Category: Completed Projects
    • Group: Decision Making Tools
    • Subject: Full Closure
    • Primary Performing Agency: Felsburg Holt & Ullevig
    • Primary Sponsor: Colorado Department of Transportation
    • Start Date: 2014-07-01
    • Completion Date: 2014-07-01
    • Keywords: full road closures, decision tools, case studies
    • Specific ABC aspect: