ABC Research Database

91 research projects found
  • image

    Laboratory Investigation of Grouted Coupler Connection Details for ABC Bridge Projects

    • Category: Completed Projects
    • Group: Sub Structure
    • Subject: Grouted Couplers, Non-seismic
    • Primary Performing Agency: Iowa State University, AmesInstitute for Transportation Studies
    • Primary Sponsor: Iowa Department of Transportation
    • Start Date: 2012-12-01
    • Completion Date: 2014-12-01
    • Keywords:

      ABC connection details, accelerated bridge construction, chloride penetration testing, fatigue load testing, grouted coupler connections, Keg Creek Bridge, precast concrete bridges, static load testing

    • Specific ABC aspect:
  • Design and Performance Verification of a Bridge Column/Footing/Pile System for Accelerated Bridge Construction (ABC), TR-673

    • Category: On-Going Projects
    • Group: Sub Structure
    • Subject: Footing/Column/Cap
    • Primary Performing Agency: Iowa State University, AmesInstitute for Transportation Studies
    • Primary Sponsor: Iowa Department of Transportation
    • Start Date: 2014-06-01
    • Completion Date: 2016-12-31
    • Keywords:

      Bridge construction, Bridge design, Prefabricated bridges, Service life, Bridge abutments, Columns, Footings,Bridge superstructures, State departments of transportation, Iowa

    • Specific ABC aspect:
  • Seismic Performance of Concrete Filled Steel Tube (CFST) Bridge Columns For Accelerated Bridge Construction

    • Category: On-Going Projects
    • Group: Seismic
    • Subject: CFST
    • Primary Performing Agency: Mountain-Plains Consortium
    • Primary Sponsor: Research and Innovative Technology Administration
    • Start Date: 2012-01-01
    • Completion Date: 2016-12-31
    • Keywords:

      Bridge construction; Bridge design; Bridge piers; Columns; Concrete; Earthquake resistant design

    • Specific ABC aspect:
  • Column Pile Shaft Pin Connections

    • Category: On-Going Projects
    • Group: Seismic
    • Subject: Columns
    • Primary Performing Agency: University of Nevada-Reno
    • Primary Sponsor: California Department of Transportation (Caltrans)
    • Start Date: 2016-12-06
    • Completion Date: 0000-00-00
    • Keywords:
    • Specific ABC aspect:
  • Column Base Pipe Pins

    • Category: On-Going Projects
    • Group: Seismic
    • Subject: Columns
    • Primary Performing Agency: University of Nevada-Reno
    • Primary Sponsor: California Department of Transportation (Caltrans)
    • Start Date: 2012-07-01
    • Completion Date: 0000-00-00
    • Keywords:
    • Specific ABC aspect:
  • Compression Response of a rapid-strengthening UHPC Formulation

    • Category: Completed Projects
    • Group: UHPC
    • Subject: High Early UHPC
    • Primary Performing Agency: Turner-Fairbank Highway Research Center
    • Primary Sponsor: Federal Highway Administration (FHWA)
    • Start Date: 2012-01-01
    • Completion Date: 0000-00-00
    • Keywords:
    • Specific ABC aspect:
  • image

    Development, Characterization and Applications of Non-Proprietary Ultra High Performance Concretes for Highway Bridges

    • Category: On-Going Projects
    • Group: UHPC
    • Subject: Alternative to UHPC
    • Primary Performing Agency: Regents of the University of Michigan, Ann Arbor
    • Primary Sponsor: Michigan Department of Transportation
    • Start Date: 2013-01-01
    • Completion Date: 2017-01-01
    • Keywords:

      Bridge construction; Bridge members; Compressive strength; Concrete bridges; Cracking; Energy absorption; High performance concrete; Mechanical properties; Tensile strength; Ultra high performance concrete

    • Specific ABC aspect:
  • Framework for Prefabricated Bridge Elements and Systems (PBES) Decision Making

    • Category: Completed Projects
    • Group: Decision Making Tools
    • Subject: FHWA
    • Primary Performing Agency:
    • Primary Sponsor:
    • Start Date: 2004-01-01
    • Completion Date: 2006-01-01
    • Keywords:
    • Specific ABC aspect:
  • Accelerated Construction Decision-Making Process for Bridges

    • Category: Completed Projects
    • Group: Decision Making Tools
    • Subject: AHP
    • Primary Performing Agency: University of Cincinnati
    • Primary Sponsor: Midwest Regional University Transportation Center
    • Start Date: 2004-08-01
    • Completion Date: 2005-07-31
    • Keywords:

      Accelerated Construction, Bridges, Analytical Hierarchy Process, Decision Making System

    • Specific ABC aspect:
  • image

    Accelerated Bridge Construction Decision Making and Economic Modeling Tool, TPF-5(221)

    • Category: Completed Projects
    • Group: Decision Making Tools
    • Subject: AHP
    • Primary Performing Agency: Oregon State University
    • Primary Sponsor: Oregon Department of Transportation (lead in pooled fund study)
    • Start Date: 2009-12-23
    • Completion Date: 2011-06-30
    • Keywords:

      ACCELERATED BRIDGE CONSTRUCTION, DECISION MAKING, AHP, CRITERIA HIERARCHY

    • Specific ABC aspect: