Larpenteur Avenue Bridge

  • Year ABC Built: 2014
  • State: Minnesota
  • Owner: State
  • Location: Urban
  • Spans: Two-span
  • Beam Material: Concrete
  • Max Span Length (ft.): 91.20
  • Total Bridge Length (ft.): 187.10
  • Construction Equipment: Lateral Slide
  • State ID #: 62646
  • NBI #: 000000000062646
  • Coordinates:     Latitude: 44.9918594, Longitude: -93.0892715
  • Bridge Description

  • Project Summary: Lateral slide of 2-span bridge
  • Project Location: on Larpenteur Avenue over Interstate 35E in the city of Saint Paul in Ramsey County
  • Mobility Impact Time: 47 days for ABC vs. 100 days for conventional construction
  • Impact Category: Tier 5 (within 3 months)
  • Primary Drivers:
    •  reduced traffic impacts;
    • reduced onsite construction time;
    • improved work-zone safety;
    • improved site constructability
  • Dimensions: 187.1-ft-long and 75.8-ft-wide 2-span prestressed concrete I beam bridge (91.2 ft – 91.2 ft); no skew
  • Average Daily Traffic (at time of construction): 13500
  • Traffic Management:
  • Existing Bridge Description: The existing 4-span prestressed concrete beam bridge was 185.5-ft long and 61-ft wide with pile-supported substructures. It had four traffic lanes, 2 ft-wide shoulders and one narrow 5 ft-wide sidewalk. Built in 1960, the bridge was deteriorated and did not meet the necessary geometrics for the project and required replacement.
  • Replacement or New Bridge: The replacement bridge has four through lanes, a center turn lane, wider shoulders and 8’ wide sidewalk. The cross-section consists of 7 45”-deep prestressed concrete beams spaced at 11.33’ with a 9-inch-thick cast-in-place concrete deck. The semi-integral abutments were cast in place and founded on spread footings.
  • Construction Method: The Larpenteur Avenue Bridge carrying local traffic over I-35E was selected to be replaced using the lateral slide (Slide-In Bridge Construction (SIBC)) method. The use of SIBC for this particular bridge enabled the contractor to reduce the duration of the bridge closure (over traditional construction), and to complete the construction of the bridges over I-35E.  The contractor’s team elected to utilize temporary steel pile bents to support the new superstructure in the temporary position adjacent to the existing bridge. While the existing bridge remained in service, the temporary steel pile bents were constructed, and the new bridge superstructure was constructed in the temporary position. As the deck cured on the new superstructure, the existing bridge was closed and demolished, and the new substructures were constructed. After the new substructure concrete and the new superstructure concrete achieved strength the new superstructure was pushed into place using hydraulic jacks.
  • Stakeholder Feedback:

    Lesson learneds (as provided by contractor) included: Use liquid detergent sparingly so as to not reduce friction between some of the other slide components.  Guide brackets used to keep superstructure in correct position during the move need to be substantial to prevent racking.  Perform a short test slide 24 hours prior to actual slide to work out any “bugs".

    The use of an ultra-high molecular weight (UHMW) sliding surface proved to be more durable than Teflon. The UHMW has a sliding coefficient 25% greater than that of Teflon but still performed very well and had much better abrasion characteristics and seemed more durable. A thicker elastic medium between the slide shoe and bridge to allow for the deviations in concrete and steel elevations would be helpful.

  • High Performance Material: (none)
  • Project Planning

  • Decision Making Tools: (none)
  • Site Procurement: (none)
  • Project Delivery: Design-Build
  • Contracting: Best Value Award
  • Geotechnical Solutions

  • Foundations & Walls: (none)
  • Rapid Embankment: (none)
  • Structural Solutions

  • Prefabricated Bridge Elements: (none)
  • Prefabricated Bridge Systems: FDcBc {Full-Width concrete-Decked concrete Beam Unit}
  • Miscellaneous Prefabricated: Thin-Bonded Epoxy Overlay
  • ABC Construction Equipment: Lateral Slide w/pad
  • Cost & Funding

  • Costs: The engineer’s estimate for the project was $ 2,270,000. The low bid was $3,000,000. There were 4 bidders. The cost per square foot of bridge was $211.53 compared to $120 for conventional construction in this region during the same time period.
  • Funding Source: (none)
  • Incentive Program: (none)
  • Additional Information

Downloadable Resources

Contract Plans:
Specifications:
Other Related Information:
https://www.youtube.com/watch?v=WSf2G2dJMnE

Photo Credits: Minnesota DOT

 

Contacts

Owner: Paul Rowekamp, P.E.
Bridge Standards and Research Engineer
Minnesota Department of Transportation
paul.rowekamp@state.mn.us
651-366-4484

Designer: George Gorrill, P.E.
Michael Baker

Contractor: Richard Fahland, P.E.
Ames Construction
rfahland@amesco.com
952-435-7106

Subcontractors: James M. Ronning, P.E.
James Michael Ronning
Services Provided: : Bridge slide
952-470-6399

Submitter: Paul Rowekamp, P.E.
Bridge Standards and Research Engineer
Minnesota Department of Transportation
paul.rowekamp@state.mn.us
651-366-4484