SR 520 / SR 202 Interchange

  • Year ABC Built: 2007
  • State: Washington
  • Owner: State
  • Location: Urban
  • Spans: Three-span
  • Beam Material: Concrete
  • Max Span Length (ft.): 145.00
  • Total Bridge Length (ft.): 435.00
  • Construction Equipment: Other ABC Method
  • State ID #: 202/45W-W
  • NBI #: 0017272A
  • Coordinates:     Latitude: 47.6688995, Longitude: -122.1085968
  • Bridge Description

  • Project Summary: The contractor of this design-bid-build project elected to modify the crossbeam from cast-in-place crossbeams to the precast crossbeams. The crossbeams were cast on site, on grade at the base of the columns.
  • Project Location: Bellevue, Washington
  • Mobility Impact Time: The contractor submitted for 10 days of time savings, reducing the construction schedule for the crossbeams.
  • Impact Category: Tier 5 (within 3 months)
  • Primary Drivers:

    Contractor-initiated change - The contractor proposed to eliminate the falsework and simplify the crossbeam formwork by precasting the crossbeam on-site.

  • Dimensions: This bridge has three spans with five prestressed I-girder (WF74G) and a CIP bridge deck. All spans are 145' long with the roadway width varying from 45' to 46'. All pier are normal to the roadway alignment. The precast crossbeam elements were 45' long x 7' wide and varied in depth from 2' to 5'.
  • Average Daily Traffic (at time of construction): 35000
  • Traffic Management: Traffic was not impacted for the construction of this bridge.
  • Existing Bridge Description:

    No existing bridge was replaced as a result of the construction of this bridge.

  • Replacement or New Bridge:

    This bridge was originally designed to be constructed conventionally and to have CIP concrete piers, including the columns and crossbeams. Due to the complex geometry of the crossbeam, the contractor elected to cast the crossbeam at ground level at each corresponding pier. It eliminated falsework construction to support the crossbeam formwork on the existing grade. Corrugated duct were cast into the crossbeam for the column reinforcement, which were grouted after erection. A single 500 ton crane was used to erect the crossbeam.

  • Construction Method:

    The two crossbeams were precast on-site, on grade and erected with 500 ton crane. The elimination of the falsework to support crossbeam formwork accelerated and simplified the construction of the crossbeam with complex geometry. Other than the decision for acceptance from the owner, all decision making was done by the contractor to reduce costs and improve convenience.

  • Stakeholder Feedback: (none)
  • High Performance Material: (none)
  • Project Planning

  • Decision Making Tools: (none)
  • Site Procurement: (none)
  • Project Delivery: Design-Bid-Build
  • Contracting: Contractor option
  • Geotechnical Solutions

  • Foundations & Walls: (none)
  • Rapid Embankment: (none)
  • Structural Solutions

  • Prefabricated Bridge Elements: Precast column cap (precast bent cap; precast crossbeam); grouted duct connection
  • Prefabricated Bridge Systems: (none)
  • Miscellaneous Prefabricated: (none)
  • ABC Construction Equipment: High-capacity crane
  • Cost & Funding

  • Costs:

    No cost savings were submitted for the contractor's proposed change to precast the crossbeam at grade, on-site.

  • Funding Source: (none)
  • Incentive Program: (none)
  • Additional Information

    Other Notes:

    Contract plans are available below. The precast crossbeam was done by change order; there are no precast crossbeam specifications or bid tabs.

Downloadable Resources

Contract Plans:
Other Related Information:
Photo Credits: Washington State Department of Transportation

 

Contacts

Owner: Bijan Khaleghi, Ph.D.,
P.E., State Bridge Design Engineer
Washington State Department of Transportation
khalegb@wsdot.wa.gov
360-705-7181

Designer: Arthur Chu, P.E.
Washington State Department of Transportation
chua@wsdot.wa.gov
360-705-7176

Submitter: Jed Bingle, P.E.,
S.E. Accelerated and Innovative Bridge Construction (ABC) Specialist
WSDOT Bridge & Structures Office
binglej@wsdot.wa.gov
360-705-7222