2001 - I-5 / South 38th Street Bridge

  • Year ABC Built: 2001
  • State: Washington
  • Owner: State
  • Location: Urban
  • Spans: Two-span
  • Beam Material: Concrete
  • Max Span Length (ft.): 164.25
  • Total Bridge Length (ft.): 325.00
  • Construction Equipment: Conventional
  • State ID #: 5/430
  • NBI #: 0015935A000000
  • Coordinates:     Latitude: 47.2233315, Longitude: -122.4616699
  • Bridge Description

  • Project Summary:
  • Project Location: South 38th Street over I-5 in the city of Tacoma in Pierce County
  • Mobility Impact Time: ABC: Partial-depth deck panels placed within one week with limited nighttime I-5 lane closures; Conventional: Additional weeks of I-5 lane closures for full-depth CIP deck
  • Impact Category: Tier 6 (longer but reduced by months/years)
  • Primary Drivers:

    • reduced traffic impacts • reduced onsite construction time • improved work-zone safety • improved site constructability • improved material quality and product durability • minimized environmental impacts • reduced life-cycle cost

  • Dimensions: 325-ft-long and 106-ft-wide two-span prestressed trapezoidal tub girder bridge (160.75 ft -164.25 ft)
  • Average Daily Traffic (at time of construction): 248000
  • Traffic Management: Traffic management alternative, if constructed conventionally: extended use of lane closures
  • Existing Bridge Description: The existing four-span bridge was replaced to add capacity near a high-traffic-volume shopping mall interchange.
  • Replacement or New Bridge: The replacement bridge has 11.8-ft-wide traffic lanes and 11.8-ft-wide shoulders. The cross-section consists of 10.3-ft-wide 5.8-ft-deep precast post-tensioned open-top trapezoidal beams spaced at 18 ft with an 8-inch-thick composite deck consisting of 3.5-inch-thick partial-depth deck panels and 4.5-inch-thick cast-in-place concrete topping. The substructures were conventional concrete columns founded on spread footings.
  • Construction Method: To reduce construction time and minimize traffic disruption, the Washington State Department of Transportation (WSDOT) chose partial-depth precast stay-in-place deck panels in the design of this replacement bridge over I-5 in Tacoma. The new post-tensioned box girder bridge uses precast tub girder segments. With no need to construct and remove conventional deck forms, lane closures on I-5 were greatly reduced. Leveling screws were used to adjust camber on the 3.5-inch-thick precast pretensioned panels, and all 766 panels were placed within a week of limited nighttime I-5 lane closures.The open-top precast trapezoidal box girder segments were erected with three segments per span. The 3-ft-wide transverse closure joints between segments, supported on falsework, were cast with partial-height intermediate diaphragms between segments. The partial-depth precast deck panels were then erected and adjusted with leveling screws. Grout was placed below the panels to provide continuous support. The composite deck topping was cast, and girder segments were longitudinally post-tensioned together.The contract allowed a maximum closure of 227 working days. Onsite work, including temporary closures, was to begin January 3, and the bridge was to be re-opened to traffic by midnight, September 15. In addition to the standard liquidated damages clause, the contract included a disincentive of $8,000 per day for failure to open all lanes of traffic on the bridge and ramp by 12:01 am, September 15. In addition for closures beyond the scheduled opening time, liquidated damages were assessed per 15 minutes prorated to the nearest five minutes as follows:• $50 to $300 for each ramp• $2,500 for single and double lane closures on northbound mainline SR 5• $1,100 for single, double and triple lane closures on southbound mainline SR 5The contract required weekly meetings of key contractor and WSDOT personnel.
  • Stakeholder Feedback: (none)
  • High Performance Material: (none)
  • Project Planning

  • Decision Making Tools: (none)
  • Site Procurement: (none)
  • Project Delivery: • Design-bid-build
  • Contracting: • Full lane closure• Incentive / disincentive clause
  • Geotechnical Solutions

  • Foundations & Walls: (none)
  • Rapid Embankment: (none)
  • Structural Solutions

  • Prefabricated Bridge Elements: • Partial-depth precast deck panels
  • Prefabricated Bridge Systems: (none)
  • Miscellaneous Prefabricated: (none)
  • ABC Construction Equipment: Conventional
  • Cost & Funding

  • Costs: The engineer’s estimate for the project was $3,763,000. The low bid was $3,158,000 ($605,000 = 16% lower than the engineer’s estimate). The cost per square foot of bridge was $92 compared to $119 for conventional construction in this region in 2001.
  • Funding Source: State Only
  • Incentive Program: (none)
  • Additional Information

Downloadable Resources

Contract Plans:
Specifications:
Other Related Information:
Photo Credits: Washington State Department of Transportation

 

Contacts

Owner: Bijan Khaleghi, P.E.
State Bridge Design Engineer
Washington State Department of Transportation
khalegb@wsdot.wa.gov
360-705-7181

Designer: Tim Moore, P.E.
Washington State Department of Transportation
mooret@wsdot.wa.gov
206-805-5440

Bridge Description Summary Sheet: